- LH Door is reskinned, awaiting fitting and tweaking (which I will do once the floor on the LH side is completed). It also needs seam sealing inside.
- The LH front floor is practically complete. All I need to do is dress the plug welds, and get rid of the remaining surface rust on the interior before giving the bare metal a temporary coat of primer.
- The quarterlight frame for the LH door needs starting again, as there's some surace rust reappearing. It needs stripping, derusting and repainting.
- I have enough parts to repair the LH rear floor.
- I have rebuilt the LH rear drum brake, and have some parts to re-build the RH rear drum brake. I only need to rebuild the brakes enough now to ensure the handbrake works, as I plan to pull the rear axle out. This is so I can turn the car round on my slopy drive so I can fix the floor on the RH side.
- The bumpers are in the process of being refurbed - they need stripping down, derusting and the plastic parts repainting. I need two new sidelight assemblies - the fixing bolts were seized and broke on both of them, as well as a replacement front centre bumper cover.
Friday, January 30, 2009
TR7 Progress
A wee note about progress on the TR7.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment